Planned Maintenance work

  • PCC (Power Control Centre) & MCC (Machine Control Centre) considered in yearly planned maintenance work.
  •  Heavy machine considered in Half yearly planned maintenance work.
  •  Planned maintenance should be finished in 1 day to 3 days as per the size of machines.
  •  77 % Failures reduced after planned maintenance work.